Energie « Terug naar discussie overzicht

Windpower - Europe

2.084 Posts, Pagina: « 1 2 3 4 5 6 ... 16 17 18 19 20 21 22 23 24 25 26 ... 101 102 103 104 105 » | Laatste
voda
0
New South Wales okays 77-turbine wind project by CWP Renewables

Renewable See News reported that a 77-turbine wind farm proposal by CWP Renewables has received the green light from the Department of Planning and Environment in the Australian state of New South Wales.

A document dated May 10 gives approval to the roughly 135-MW Crudine Ridge Wind Farm, subject to a number of conditions. The wind park is expected to use turbines with capacities of between 1.5 MW and 3.4 MW, to be installed near Pyramul. The required investment is estimated at AUD 200 million (USD 147m/EUR 129m).

CWP Renewables is a joint venture between Continental Wind Partners and Wind Prospect Group. It initially planned to install up to 106 turbines at the Crudine Ridge project, but reduced the number after public consultations.

The power plant will operate for 20-25 years, after which period it will be either decommissioned or repowered.

Source : Renewables See News
voda
0
Ministerie: Windpark Borssele waarschijnlijk goedkoper dan verwacht

UTRECHT – Er zijn 38 biedingen binnengekomen om windpark Borssele te ontwikkelen en uit een eerste indruk blijkt dat de kosten lager gaan uitkomen dan eerder begroot

Dit bevestigt het ministerie van Economische Zaken aan de Groene Courant.

“Op basis van een eerste indruk van de biedingen in de tender ziet het er naar uit dat de windsector een belangrijke stap heeft gezet op het gebied van kostenreductie”, aldus minister Henk Kamp (Economische Zaken).

Lagere kosten

“Dit is positief, want het betekent dat het windpark waarschijnlijk tegenover lagere kosten gebouwd kan worden dan van te voren begroot.”

De meeste biedingen kwamen binnen van samenwerkingsverbanden uit binnen- en buitenland. Zo werken onder andere Eneco, Shell en Van Oord samen. Vattenfall probeert de ontwikkeling van de windmolens alleen binnen te halen.

Voor 11 augustus wordt bekendgemaakt welk bedrijven of welke bedrijf de eerste 700 megawatt aan windmolens mag gaan bouwen. Het maximale subsidiebedrag komt uit op 12,4 cent per kilowattuur.

Banen

Kamp vindt dat de tender aantoont dat het bedrijfsleven kansen ziet als het om de realisatie van wind op zee gaat. Hij wijst ook op de voordelen voor het Nederlandse bedrijfsleven. “De Nederlandse industrie heeft nu al ongeveer een kwart van de Europese markt voor windmolens op zee in handen.”

“Door de ontwikkeling van windparken op zee worden er in Nederland rond de 2150 banen gecreëerd in de productie, bouw, onderzoek en beleid van wind op zee projecten. Naar verwachting zal de werkgelegenheid groeien naar 10.000 banen in 2020”, aldus Kamp.

In de eerste week van september wordt de tender voor het tweede deel van Windpark Borssele, nog eens 2 kavels van elk 350 megawatt, geopend.

Lees meer over de ontwikkeling van wind op zee in het dossier

groenecourant.nl/windenergie/minister...
voda
0
Wise: 9 energiebedrijven met meer dan 50 procent windenergie in mix


UTRECHT – Er zijn 9 energiebedrijven in Nederland die meer dan 50 procent van de stroom in hun energiemix uit windmolens halen.

Dit stelt WISE Nederland in een jaarlijkse vergelijking van alle energieleveranciers.

Een viertal bedrijven leveren voor bijna alleen maar stroom uit windmolens, vaak aangevuld met een beetje zonnestroom.

Het gaat dan om Huismerk Energie, Qurrent, Pure Energie en DE Unie. Verder halen Vandebron, NLD, Hezelaer Energie, Fenor en Energieflex ruim 50 procent van hun stroom uit windmolens.

Van de grote energieleveranciers scoort Eneco hoog met een aandeel van 31,5 procent voor windenergie. Voor Nuon staat het cijfer op 5,7 procent en Essent op 5,6 procent.

Aanbieders Budget Energie en NLD vallen op met het hoge aandeel zonnestroom van respectievelijk 77 procent en 20,4 procent.

Foto: Flickr/Raymond Bosma CC BY-ND 2.0

groenecourant.nl/windenergie/wise-9-e...
voda
0
Gemeente Emmen wijst 3 locaties aan voor windmolens


UTRECHT – De gemeente Emmen heeft een drietal locaties aangewezen voor het plaatsen van windmolens.

Het gaat om de gebieden Pottendijk (50,5 MW), Zwartenbergerweg (24 MW) en N34 (21 MW). Ontwikkelaars krijgen hier de mogelijkheid om turbines te bouwen.

In totaal moeten er voor 2020 95,5 megawatt aan windmolens worden gebouwd.

De gemeente zegt zelf locaties te hebben uitgezocht die zo min mogelijk hinder opleveren voor omwonenden.

“Met deze gekozen gebieden kan de gemeente 95,5 megawatt windenergie mogelijk maken met zo min mogelijk gehinderden binnen 500 en 1100 meter”, aldus de gemeente.

Lees ook: Onderzoek: Windmolens leveren geen probleem op voor toerisme Emmen

Informatiebijeenkomsten

Verder worden er geen gebieden ingesloten door 2 of meer windparken en bleek uit onderzoek dat hinder door geluid en slagschaduw in deze gebieden het laagst is.

De gemeenteraad laat zich op 28 juni uit over de plannen. Op 27 mei en 30 mei zijn informatiebijeenkomsten gepland.

De gemeente stelde een aantal eisen op waaronder een maximale tiphoogte van 149 meter, een maximale ashoogte van 100 meter en een vergunning tot maximaal voor 16 jaar. Veel van de plannen die ontwikkelaars hadden ingediend konden hier niet aan voldoen.

Lees meer over windenergie in Emmen in het dossier

groenecourant.nl/windenergie/gemeente...
[verwijderd]
0
Windmolen in Tilburg stilgezet: wankelt, beweegt op en neer...

www.telegraaf.nl/binnenland/25902023/...

Omroep Brabant is ter plaatse, en doet verslag van de wiebelende windmolen.
www.omroepbrabant.nl/?news/249940932/...,+straten+vrijgegeven.aspx

Ook het Brabants Dagblad is er bij: Wankelende windmolen stilgezet.
www.bd.nl/regio/112-nieuws/wankelende...
voda
0
Vattenfall steekt 1 miljard euro in Deens windpark

UTRECHT – Vattenfall, moederbedrijf van Nuon, investeert zo’n 1 miljard euro in de bouw van het Deense offshore windpark Horns Rev 3 voor de westkust van Denemarken.

In 2018 worden de windmolens naar verwachting opgeleverd. Horns Rev 3 zal genoeg stroom opleveren voor 400.000 huishoudens en heeft een cumulatief vermogen van 400 megawatt

In februari 2015 won Vattenfall de tender voor Horns Rev 3.

Volgens Gunnar Groebler, directeur bij de winddivisie van Vattenfall, is Horns Rev 3 een mijlpaal voor het bedrijf.

“De ervaring die we hebben opgedaan bij onze andere windprojecten had een zeer positief effect en kwam ons ten goede bij het bieden tijdens de tender.”

groenecourant.nl/windenergie/vattenfa...
voda
0
Gerechtshof: mogelijke windmolens op 2 kilometer beïnvloeden woz-waarde niet

UTRECHT – De mogelijke komst van het geplande windpark in de Veenkoloniën beïnvloedt de woz-waarde van een woning op 2 kilometer afstand niet.

Dit heeft het Gerechtshof Arnhem-Leeuwarden geoordeeld. Hiermee gaat het hof in tegen een eerdere uitspraak van de rechtbank in Leeuwarden.

Het geschil draait om de vaststelling van de woz-waarde van een woning in de Drentse gemeente Borger-Odoorn in 2012.

De verantwoordelijke ambtenaar oordeelde dat de mogelijke komt van windmolens in de buurt van de woning geen effect had op de waarde van het huis.

De woz-waarde werd op 321.000 euro vastgesteld.

Woz-verlaging

De bewoner ging in beroep tegen de uitspraak. De rechtbank Noord-Nederland ging hierin mee en verlaagde de woz-waarde met 30.000 euro. Vervolgens ging de heffingsambtenaar in hoger beroep.

Het gerechtshof verwijst naar het onderzoek van twee Nederlandse wetenschappers naar de verkoopwaarde van huizen in de buurt van windmolens.

Lees ook: Wetenschappers zien bewijs voor waardedaling woningen door windmolens

Daarin wordt geschreven dat omwonenden tot maximaal 1 kilometer van een turbine eventueel last hebben van de slagschaduw of het geluid. De omwonende in deze zaak woont op ruim 2 kilometer.

Ook van eventuele horizonvervuiling is geen sprake, oordeelt het hof. Andere waardedrukkende factoren zijn niet naar voren gekomen.

Geen waardedaling

Het Gerechtshof merkt verder op dat de heffingsambtenaar bewijs heeft geleverd dat de huizenprijzen in de regio niet zijn gedaald nadat duidelijk werd dat er mogelijk een windpark zou komen in de regio. Tegenstanders van de windmolens claimen wel dat huizenkopers wegblijven door de aangekondigde windmolens.

“Het Hof is van oordeel dat deze gegevens mede bijdragen aan het standpunt van de heffingsambtenaar dat de plannen voor de aanleg van een windmolenpark geen invloed op de prijsvorming hebben”, aldus de rechters.

In de Veenkoloniën zijn plannen voor zo´n 50 windmolens. In de regio is forse weerstand tegen de turbines en ook lokale overheden zien het windpark niet zitten.

Hoewel uit het eerder genoemd onderzoek bleek dat huizen maximaal 2,3 procent van hun waarde verliezen, heeft de gemeente AA en Hunze vooruitlopend op de komst van de windmolens de woz-waarde voor honderden huizen 2,5 tot 12,5 procent verlaagd.

Lees meer over de geplande windmolens in de Veenkoloniën in het dossier

Voor sub-links, zie link hieronder.

groenecourant.nl/windenergie/gerechts...
voda
0
Siemens to install 84 wind turbine by 2018 in Scotland

Review Europe reported that Siemens will be installing 84 wind turbines in Scotland from the start of 2018. The company is to supply, install and commission the turbines, each with a 154-meter rotor diameter designed to generate seven megawatts (MW) of power, for the "Beatrice" project.

Furthermore the scope of supply comprises the offshore grid connection to the mainland in consortium with Nexans who will supply the connecting export cables. Siemens will deliver the onshore and offshore substations consisting of two offshore transformer modules (OTM) which are smaller in weight and size and thus saving costs.

Beatrice Offshore Windfarm Ltd. (BOWL), is a partnership formed between SSE (40 percent), Copenhagen Infrastructure Partners (35 percent) and SDIC Power (25 percent). The offshore wind power plant's capacity of 588 MW will be sufficient to supply more than 400,000 UK households with ecofriendly electricity. Siemens will additionally be responsible for servicing the wind farm over a period of 15 years.

Mr Michael Hannibal, CEO of the Offshore Market Unit of the Siemens Wind Power and Renewables Division, said that "This is a significant order for our new 7-megawatt-class wind turbine. We are looking forward to working with our customer on this large offshore wind power project off the Scottish coast."

Mr Mirko Düsel, CEO Transmission Solutions Business Unit at Siemens, said that "We are proud to announce the first reference for our newly developed Offshore Transformer Module together with our customer. The application of light weight distributed substations is an important lever for reaching Siemens' goal of reducing the costs of wind power generated offshore to below 10 euro cts/kWh by 2020."

The Beatrice offshore wind farm will be located around 14 kilometers off the Scottish coast. The SWT-7.0-154 wind turbines will be erected on jacket foundations in ocean depths between 35 and 56 meters. Siemens plans to produce the corresponding wind turbine blades for Beatrice at its Hull facility. Installation of the wind turbines is scheduled to begin in the summer of 2018.

Following commissioning of the plant in 2019, Siemens will also be responsible for service and maintenance for the wind turbines within the framework of a long-term service contract extending over a period of 15 years. The contract also covers remote monitoring and diagnostics for the wind turbines so as to ensure their long-term availability and performance. The logistics concept for this plant also includes the use of a helicopter.

Mr Mark Albenze, CEO Power Generation Services Wind Power and Renewables Business Unit at Siemens, said that "We are pleased to be working side-by-side with the BOWL partnership over the next 15 years to provide clean safe reliable power to the citizens of the UK. We are excited about this project and are looking forward to providing our advanced offshore logistics."

For the grid access solution, Siemens will deliver two offshore transformer modules , which are one third smaller in size and weight compared to a conventional alternating-current (AC) platform. Siemens' partner in delivering the offshore grid connection, Nexans, will be responsible for design, supply and installation of the export cable, both offshore and onshore. The OTM's will be linked together to provide the required transmission capacity.

Focusing on the core electrical equipment and removing a number of optional ancillary systems made this space and weight reduction possible, which also results in a reduced maintenance regime. The grid access solution will be project managed and engineered from the Siemens Energy Management Renewable Energy Engineering Centre in Manchester, UK.

Source : Review Europe
voda
0
BAM bouwt afzinkbare voeten voor windturbines

Nieuwe techniek voor offshore-windpark in dieper water.

BAM heeft een opdracht gekregen van het Britse energieconcern EDF voor het ontwerp en de bouw van vijftig afzinkbare windturbinefundaties. Dit maakte het bouwbedrijf dinsdag bekend, zonder financiële details te geven.

De fundaties worden door BAM Infra en het Britse onderdeel BAM Nuttall gebouwd als drijvende betonnen caissons, om te worden afgezonken in de Noordzee voor de kust van Northumberland. Deze methode maakt het mogelijk om offshore-windparken te bouwen in diepere wateren.

Het aandeel BAM Groep noteerde dinsdag op een groen Damrak 1,3 procent hoger op 3,98 euro.

Door: ABM Financial News.

Info@abmfn.nl

Redactie: +31(0)20 26 28 999

Copyright ABM Financial News. All rights reserved

(END) Dow Jones Newswires
voda
0
Nieuwe Duitse windklus voor Van Oord

Gepubliceerd op 7 jun 2016 om 14:16 | Views:

ROTTERDAM (AFN) - Bagger- en bouwbedrijf Van Oord gaat samen met het Britse Highland een nieuw offshore windpark bouwen dat circa 90 kilometer van de Duitse kust komt te liggen. Dat meldde Van Oord dinsdag, zonder financiële details te verstrekken.

Bijzonder aan het project is dat Van Oord niet alleen aannemer is, maar ook aandeelhouder wordt van het windpark in de Noordzee. Het Nederlandse bedrijf zal zich bezighouden met het ontwerp, het aanbrengen van de funderingen en het leveren en installeren van het bijkomende elektrische kabelwerk.

Het is de bedoeling dat de bouw in 2018 van start gaat. Het windpark, genaamd Deutsche Bucht, wordt in 2019 in gebruik genomen. De windmolens van het park moeten op termijn ongeveer 250.000 huishoudens van stroom voorzien.

Van Oord heeft de laatste jaren al meer offshore windparken aangelegd. Op dit moment heeft de onderneming nog drie andere soortgelijke projecten in uitvoering.
[verwijderd]
0
Welcome to Tennet Island! NEW, NEW, NEW!!!

Wilt U heerlijk buiten tussen de windmolens wonen? Omringd door windmolenvrienden net als U? Dat kan! Alles splinternieuw.
Weg met uw vijanden! Zij zitten achter de dijk, de zee, en een andere dijk. Heel ver weg dus.

fd.nl/economie-politiek/1155637/tenne...

P.S.: De locatie is ook interessant voor megastallen met varkens, kippen en koeien met aansluitende zeedierkweek.
[verwijderd]
0
Is Tennet Island (betere link):
www.google.nl/url?sa=t&rct=j&...

een implementatie van dit plan of toch weer wat anders?
betavak-nlt.nl/downloads/v228/v228__E...
(Edit: dit was bij Zeeland op de Boomse kleilaag gedacht, en Tennet Island moet komen op Doggersbank 300km uit de kust...)

Doggersbank nl.wikipedia.org/wiki/Doggersbank
[verwijderd]
0
Toevallig is de Doggersbank zojuist aangewezen als beschermd natuurgebied.
www.nu.nl/politiek/4275901/doggersban...

Is dit niet een spaak in het wiel van Tennet Island?
Dat zou jammer zijn, want ik vind het eigenlijk best een mooi plan.
voda
0
Winddagen 2016: revanche op voorbije tijden (Video)

ROTTERDAM – Nog geen zeven jaar geleden voerde kandidaat-premier Mark Rutte campagne tégen windenergie onder de slogan: “ze draaien slechts op subsidie”.

Woensdag tijdens de Winddagen omhelst een enthousiaste minister Kamp de offshore-windsector.

Voor video, zie link:

groenecourant.nl/windenergie/winddage...
voda
0
Heineken neemt 4 windmolens officieel in gebruik

UTRECHT – Heineken neemt officieel de 4 windmolens bij de brouwerij in Zoeterwoude in gebruik. Komende vrijdag wordt het officiële startschot gegeven.

De windmolens gaan in 40 procent van het stroomverbruik van de brouwerij voorzien. De bierbrouwer heeft als doelstelling om in 2020 de locatie energieneutraal te laten opereren.

De windturbines hebben een gezamenlijke capaciteit van 12 megawatt. De bouw werd al eind 2014 gestart.

Ook het proces tot aan de bouw nam nogal wat tijd in beslag. De bierproducent had al in 2009 het voornemen om windmolens te plaatsen bij het complex in de Grote Polder.

groenecourant.nl/windenergie/heineken...
voda
0
Binnen een week een miljoen voor De Windcentrale, tiende windmolen binnen

UTRECHT – De Windcentrale heeft binnen een week 1 miljoen euro verzameld om een nieuwe windmolen te kopen.

Het is de tiende turbine voor de organisatie die vooral bekend is geworden door de crowdfunding.

De windmolens, de eerste voor De Windcentrale in Friesland, wordt per 1 augustus 2016 eigendom van 830 huishoudens.

De turbine, een Enercon E-44, gaat naar verwachting jaarlijks zo’n 1.500 megawattuur groene stroom produceren.

Vliegende start

De crowdfunding van De Boerenzwaluw maakte een vliegende start. “Binnen 10 minuten nadat de de verkoop begon, was de eerste 10% van alle beschikbare Winddelen verkocht”, aldus Harm Reitsma, oprichter van De Windcentrale

“Na een half uur stond de teller al op een kwart. Dat betekent dat er binnen een half uur ruim 230.000 euro was toegezegd. Dat is een ongekend hoog bedrag in zo’n korte tijd.”

De Windcentrale heeft sinds haar start in totaal al 16,5 miljoen euro opgehaald met de crowdfunding van windmolens.

Ruim 15.000 huishoudens voorzien daardoor in hun groene stroom met hun eigen stukje windmolen. Een stukje molen noemt De Windcentrale een Winddeel. De stroom die een Winddeel opwekt, wordt verrekend met de energierekening van de eigenaren.

Lees ook: Windcentrale gaat door grens 15 miljoen

groenecourant.nl/windenergie/41053/
voda
0
Stroom uit Nederlandse windmolens op zee moet binnen 14 jaar 7 cent per kWh kosten

UTRECHT – Een groep van 16 bedrijven in de offshore windsector wil tegen 2030 de kosten voor het produceren elektriciteit uit windmolens op zee hebben teruggebracht naar 7 cent per kilowattuur.

Tegen deze kosten moet offshore wind kunnen concurreren met fossiele brandstoffen én andere hernieuwbare bronnen zonder dat daar subsidies voor nodig zijn.

De komende 5 jaar wil het consortium, dat uiteindelijk 20 bedrijven moet gaan omvatten, minimaal 100 miljoen euro stoppen in onderzoek, ontwikkeling en demonstratieprojecten.

Oprichters

Het consortium, GROW genaamd, gaat verder nieuwe innovaties naar de markt brengen. De oprichters van de samenwerking zijn Delft Offshore Turbine, Deltares, ECN, Eneco, Lagerwey, LM Wind Power, Royal IHC, RWE, Seaway Heavy Lifting, Shell, Sif, TenneT, TNO, TU Delft, Van Oord en Volker Stevin International.

GROW is een opvolger van het onderzoeksprogramma FLOW. Hierin hebben 13 Nederlandse bedrijven en kennisinstellingen de afgelopen 5 jaar de kosten van offshore wind met 20 procent doen dalen door het introduceren van diverse innovaties.

Tijdens de Winddagen in Rotterdam worden de resultaten bekendgemaakt.

groenecourant.nl/windenergie/stroom-n...
voda
0
‘3.000 megawatt is fantastisch, maar we moeten nu het gaspedaal verder indrukken’

UTRECHT – De plannen van de overheid om tot 2023 zo’n 3.450 megawatt aan windcapaciteit in de Noordzee te realiseren zijn fantastisch, maar Nederland moet verder kijken.

Dit zegt Chris Westra, ervaringsdeskundige in de windsector, voorafgaand aan De Winddagen in het WTC in Rotterdam op 15 en 16 juni waar hij als gespreksleider zal optreden.

“Voor ons is het natuurlijk fantastisch dat we nu aan de gang zijn”, zegt hij over de windplannen op zee. “Zeker in vergelijking met andere landen, zoals Denemarken. Voor ons toch weer een opsteker.”

Gespreid bedje

Westra is positief over de huidige opzet van de tenders. “De overheid doet veel voorwerk zoals de locatiekeuze golf- en windmetingen en onderzoeken die je nodig hebt voor de berekening van funderingen en opbrengsten.

Daaraan gekoppeld een goed subsidiesysteem. “Als ontwikkelaar kom je min of meer in een gespreid bedje.”

“De vraag is of dit voldoende is. Offshore wind zal het leeuwendeel van de energietransitie moeten doen. Je moet nu al naar grote locaties zoals IJmuiden-Ver kijken.”

Andere manier

Westra denkt dat voor een grotere uitrol van windenergie op de Noordzee er een andere aanpak nodig is om windturbineparken te realiseren. Hij denkt aan het vergroten van de kavels, die nu 350 megawatt zijn, en misschien ook het gunnen van meerdere kavels aan één partij in grote gebieden ver op zee.

Shell schreef onlangs in een advies aan Tweede Kamerleden eenzelfde opzet om grootschalig windenergie in de Noordzee te ontwikkelen.

Kamp liet onlangs weten afspraken te hebben gemaakt met andere Noordzeelanden en een paar landen daarbuiten voor ontwikkeling van windenergie in de Noordzee.

”Dat was heel plezierig voor mij om te horen”, zegt de adviseur. Westra legt uit dat toen hij in Europees verband hier 4 jaar geleden naar keek, het al duidelijk was dat samenwerking nodig is als de Europese doelstellingen gehaald moeten worden.

Lees meer over de Nederlandse plannen voor wind op zee in het dossier

groenecourant.nl/windenergie/3-000-me...
2.084 Posts, Pagina: « 1 2 3 4 5 6 ... 16 17 18 19 20 21 22 23 24 25 26 ... 101 102 103 104 105 » | Laatste
Aantal posts per pagina:  20 50 100 | Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met uw e-mailadres en wachtwoord.

Direct naar Forum

Markt vandaag

 AEX
929,78  -4,64  -0,50%  18:05
 Germany40^ 22.538,70 +0,50%
 BEL 20 4.398,80 -0,19%
 Europe50^ 5.467,53 +0,25%
 US30^ 43.586,90 +0,25%
 Nasd100^ 21.119,70 -1,16%
 US500^ 5.957,06 -0,49%
 Japan225^ 38.037,00 +0,02%
 Gold spot 2.912,98 -1,29%
 EUR/USD 1,0516 +0,44%
 WTI 69,00 -2,45%
#/^ Index indications calculated real time, zie disclaimer

Stijgers

Accsys +6,87%
CM.COM +4,81%
ForFarmers +3,39%
JDE PEET'S +2,74%
ASR Nederland +2,55%

Dalers

SBM Offshore -3,26%
INPOST -3,09%
ASMI -2,89%
EBUSCO HOLDING -2,89%
Aperam -2,80%

EU stocks, real time, by Cboe Europe Ltd.; Other, Euronext & US stocks by NYSE & Cboe BZX Exchange, 15 min. delayed
#/^ Index indications calculated real time, zie disclaimer, streaming powered by: Infront